Take stock of Shri Amarnath Ji Yatra 2019 arrangements

JK News Today

RAMBAN, MAY 28:

Union Additional Secretary Home, Gyanesh Kumar and Chairman National Highway Authority of India (NHAI) N N Sinha today reviewed the   progress on National Highway (NH44) 4-laning project here at a high-level meeting.

They also inspected the construction of four laning works from Chanderkot to Nogam Banihal and took stock of Shri Amarnath Ji Yatra 2019 arrangements.

Principal Secretary Home J&K, Shaleen Kabra,  Divisional Commissioner (Div. Com), Jammu, Sanjeev Verma, IGP Traffic Alok Kumar,  IGP, Jammu, M K Sinha, Deputy Commissioner (DC), Ramban, Showkat Aijaz Baht, RO NHAI, Hem Raj,  SSP, Anita Sharma, SSP Traffic, JS Johar, ADC Dr. Basharat Hussain    and various other officers of other departments besides representatives of construction companies attended the meeting.

Additional Secretary and chairman reviewed the project wise progress including construction of four Laning ring road / bypass road Jammu, Udhampur to Chenani, Nashri to Ramban and Ramban to Banihal.

He directed the NHAI to ensure the maintenance and management of National Highway stretch from Udhampur to Banihal without disruption of transportation of traffic on the vital road link.

While inspecting  the ongoing construction work  of National Highway they directed the concerned agencies to provide smooth and safer passage to traffic especially during the Shri Amarnath Ji Yatra by maintaining potholes, Blacktopping  drainages, sprinkling of water on road and installation of crash barriers.

The Union Additional Secretary Home directed the authorities to implement interim measures suggested by the three member expert committee for accelerating pace of work besides avoiding the inconveniences of commuters.

He directed the NHAI to place additional Man and machinery at the identified vulnerable points to clear the landslides from the road without delay.

Earlier   IG Traffic and  RO National Highway, through a power point presentation, briefed the meeting about progress of construction work of four laning project, status of old alignment of national highway , physical achievements besides bottlenecks.

The Div.Com apprised the Addl. Sec about the arrangements being made by the respective departments for the smooth conduct of Shri Amarnath Ji Yatra 2019.   They also visited various Haltage points and shelter sheds designated for the yatris from Chaderkote to Nowgam Banihal.

Underlining the importance of four lane work, he directed the District Administration and construction companies for removing all bottlenecks hampering the pace of work.