JK News Today


New Delhi, August 08: Zojila Tunnel Project consists of construction of a tunnel of 13.153 km and approach roads to tunnel of length 17.030 km, totaling a total length of 30.18 km. The total Project cost (TPC) of the Project is Rs. 6,809.69 crore. The physical progress of the project as on date is 52.13%.

The scheduled completion date of the project is 29.09.2026.

A total of 1043 locals have been employed by the Supervising Consultant, Contractor & sub-contractor.

This information was given by the Union Minister for Road Transport and Highways, Shri Nitin Gadkari in a written reply in the Lok Sabha today.